...

Besni OSB TM Complete Facility

Besni OSB TM Complete Facility

Project Details

In the project located in Adıyaman province;

  • Ensuring Study Project Control.
  • Supply, Manufacturing and Shipment of Line Materials to the Construction Site.
  • Field and Installation Works,
  • Manufacturing of 665.7 tons of Galvanized Iron Pole,
  • Supply of 28.6 km phase conductor and conductor stringing,
  • Construction of 34 Electric Pole Foundations.

Project Images

Previous slide
Next slide
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.